Ausgrid Defect Notice Rectification, Sydney

Ausgrid allows 21 days from notification before supply can be disconnected. We clear defect notices as a licensed Level 2 ASP, usually the same day you call.

An electrical defect notice is a written instruction from Ausgrid telling the property owner that part of the electrical installation does not comply with the AS/NZS 3000 Wiring Rules and must be repaired. Ausgrid states that defects not repaired within 21 days of notification may result in the electricity supply being disconnected until the repairs are done. Only a licensed electrical contractor or an Accredited Service Provider can clear one, and anything on the service line, the metering, or the consumer mains needs a Level 2 ASP. DM Electrical is a Level 1 and Level 2 ASP based in Brookvale and clears defect notices across the Northern Beaches, North Shore, Eastern Suburbs, Inner West, and Sydney CBD.

What an Ausgrid Defect Notice Is

Ausgrid inspects the electrical installation and the service installation at properties across its network. Where the work does not comply with the AS/NZS 3000 Wiring Rules and the relevant NSW standards, it issues a defect notice to the property owner. The notice identifies what is wrong and sets the period you have to repair it. Notices are graded, with Ausgrid distinguishing between a minor defect and a major defect, and the more serious the safety risk the shorter the practical window.

A defect notice is not a fine and it is not a dispute. It is a repair instruction with a deadline attached, and the property owner carries the cost even when the fault was created by a previous owner or a previous contractor.

How Long You Have to Fix It

Ausgrid's published position is that any defects not repaired within 21 days after notification may result in the electricity supply to the property being disconnected until repairs are completed. Ausgrid also says an extension may be possible depending on the severity of the defect, and that it can refer the matter to NSW Fair Trading. Where the defect is an immediate safety risk, the network can act well before the 21 days are up.

The practical advice is to get the notice assessed in the first few days rather than the last few. Consumer mains and private pole work often need a network outage booked, and that booking is what sets the real timeline, not the repair itself.

What Triggers a Defect Notice

  • Perished or undersized consumer mains. The cable between your point of attachment and the switchboard has degraded, or it is too small for the load now connected. This is the most common defect we attend.
  • A failing point of attachment. The bracket carrying the service line has pulled away from the fascia, wall, or eave. Salt air shortens their life, which is why coastal properties see more of these.
  • A rotted or leaning private power pole. Privately owned poles between the street and the property are the owner's responsibility, and Ausgrid will issue a defect once one is unsafe.
  • Switchboards with no RCD protection. Older ceramic or porcelain fuse boards are often noticed when the network attends for another reason, and flagged as non-compliant.
  • Faulty earthing or a compromised neutral. A defective earth or neutral connection is treated as a serious safety issue and attracts a shorter window for repair.
  • Non-compliant meter position or enclosure. Metering that is inaccessible, damaged, or installed outside the required position will be written up at the next inspection.

Who Is Allowed to Clear a Defect Notice

Ausgrid requires all work relating to electrical connections on its network to be carried out by a licensed electrical contractor or an ASP. In practice that splits the work in two. Anything from the point of attachment through the metering to the consumer mains has to be done by a Level 2 Accredited Service Provider, because only a Level 2 ASP is permitted to break and re-seal the meter and to disconnect and reconnect from the network. Work downstream of the switchboard can be done by a general electrician.

Most defect notices touch both sides. That is why sending it to a general electrician usually costs you a week: they attend, find they cannot legally do half of it, and you start again with a Level 2. DM Electrical holds both Level 1 and Level 2 ASP accreditation, so one team handles the network side and the electrical side. If you want the distinction in plain English, see our guide to the difference between a Level 1, Level 2 and standard electrician.

What Defect Rectification Costs

There is no single price, because a defect notice is a category rather than a job. Re-fixing a point of attachment that has pulled away from a fascia is a short visit. Replacing perished consumer mains means a network outage, new cable from the attachment to the board, and often a switchboard that has to come up to standard at the same time. A private pole replacement involves excavation and is the largest of the common defects.

We quote a fixed price after assessing the property so there is no hourly meter running, and where a defect sits next to work you were going to do anyway, such as a switchboard upgrade or a smart meter install, we price them together on one outage rather than charging you for two.

Our Process

  1. Send us the notice. Call or send a photo of the defect notice with the defect number. We read the category and the deadline off the notice and tell you what actually has to be done.
  2. Assessment and fixed-price quote. We attend the property, confirm the scope, and quote the rectification as a fixed price. If the notice can be cleared on the spot, we do it on the same visit.
  3. Rectification. We carry out the repair under our Level 2 ASP accreditation, including any disconnection and reconnection from the network the job requires.
  4. Compliance lodged. We lodge the Certificate of Compliance for Electrical Work with NSW Fair Trading and notify the network so the defect is cleared against the property record.

Defect Notices Across the Northern Beaches and North Shore

The pattern of defects changes with the suburb. Coastal streets in Manly, Freshwater, Curl Curl, and Avalon produce more point of attachment and service line defects, because salt air shortens the life of the bracket and the tails. Older inland pockets around Brookvale, Frenchs Forest, and Forestville throw up more perished consumer mains and ceramic fuse boards. Larger properties on the North Shore and in the Eastern Suburbs are where most of the private pole defects come from. We work across all of it from Brookvale, and we carry the common parts on the truck so a straightforward defect can be closed out on the first visit.

Why DM Electrical

  • Same-day defect response. Defect notices come with a deadline. We routinely turn around urgent defect rectifications within 24 hours on the Northern Beaches and North Shore.
  • Level 1 and Level 2 in one truck. Switchboard upgrades that need an Ausgrid coordination do not require a second contractor, we handle the network side too.
  • Owner-operator pricing. No middle layer of project managers or subcontractor margins.

Frequently Asked Questions

How long do I have to fix an Ausgrid defect notice?

Ausgrid states that any defects not repaired within 21 days after notification may result in the electricity supply being disconnected until the repairs are completed. Ausgrid also notes it may be possible to negotiate an extension depending on the severity of the defect. Serious safety defects need to be made safe straight away rather than waiting.

Who can clear an electrical defect notice in NSW?

Ausgrid requires all work relating to connections to its network to be carried out by a licensed electrical contractor or an ASP. Anything involving the service line, the meter, or the consumer mains has to be done by a Level 2 Accredited Service Provider. A general electrician cannot legally clear that part of a notice.

What happens if I ignore a defect notice?

Ausgrid can disconnect the supply to the property until the repairs are completed, and it may refer the matter to NSW Fair Trading. Ausgrid describes disconnection as a last resort, but it is required by law to make sure connections meet the safety standards.

What does defect rectification cost?

It depends entirely on what the notice is for. Re-fixing a point of attachment is at the small end. Replacing consumer mains, or replacing a private pole, sits well above that because of the excavation, the disconnection and reconnection, and the switchboard work that often comes with it. We quote a fixed price after assessing the property, so the number you approve is the number you pay.

Can you clear the defect and do the other work at the same time?

Yes, and it is usually cheaper to do it that way. A defect on the consumer mains often sits alongside a switchboard that is due for replacement, and doing both on one disconnection avoids paying for the network outage twice.

Do you cover my area?

We clear defect notices across the Northern Beaches, the North Shore, the Eastern Suburbs, the Inner West, and Sydney CBD, from our base in Brookvale.

Related Services

Have a job in mind? Call 0410 144 047 or use the contact form and Daniel will get back to you the same business day.

Reviewed by Daniel McCormick, licensed electrician and Level 1 and Level 2 Accredited Service Provider. NSW Electrical Contractor Licence 463912C. ASP Level 1 Scheme 6697, ASP Level 2 Scheme 5922. ABN 69 643 435 358. Last updated August 2026.

Ready When You Are

Call DM Electrical or send us a quick message. We respond fast.

Contact Us
4.9 (68)
  • L
    Linda Mapledoram
    3 months ago

    Have been using the company while renovating a kitchenette and general updates throughout the premises. Found the service positive in response to all requests and prompt in delivery. Highly recommend.

  • R
    Raymond Lambie
    7 months ago

    Shaun was great. Replaced our fuse box and installed a smart meter. He was a pleasure to deal with and took the time to explain everything to us. Very happy with the job DM Electrical did.

  • V
    Vic Gigliotti
    a year ago

    We had a power outage across half our office and couldn't find the issue. DM sent an experienced electrician who solved it within 20 minutes. Extremely professional, clean and efficient. We can't recommend Dan and the team highly enough.

  • T
    Tracey Hollings
    a year ago

    The team were punctual, polite and very efficient. Did an excellent job, which was a challenge considering the damage involved. They also did a great tidy up job. Left no mess. Highly recommend the team.

  • L
    Lewis Haines
    10 months ago

    Dan and his team of highly qualified tradesmen did the level 2 change over of our electrical mains. The service, attention to detail, communication and speed is unparalleled to any electrical service I have had.

  • C
    Claudine Athas
    a year ago

    Within an hour Dan sent the team to sort my urgent outage at work. He was kind, empathetic and professional. The problem was fixed and new power points installed with no fuss. Thanks Dan, you're a legend!

  • N
    Neil Smith
    a year ago

    Thanks to Dan for organising my job so promptly. Luke and Cooper are very pleasant young men, polite and professional, who did an excellent job. I would definitely recommend DM Electrical.

  • H
    Heather Rudkin
    8 months ago

    Excellent service provided on a timely basis which resolved a significant electrical issue at our home.

  • C
    Chase Burrows
    a year ago

    Amazing job, issue was fixed quickly and for good money. Good blokes too! Couldn't ask for anything better, definitely will be going back.

Call Now Get a Quote