Underground power cables on a NSW property are usually buried with about 500 mm of cover when they run in heavy-duty orange conduit, the most common method under the Wiring Rules (AS/NZS 3000). Less cover is allowed only where extra protection, such as a concrete slab, is added. Treat any figure as a guide: the real depth is never guaranteed.
That matters before you put in a fence post, a garden bed, a pool or a new slab. This guide covers how deep the rules say cables should be, who owns the cables you might hit, why a cable can be shallower than it should be, and how to find one before you dig.
How deep must underground cables be buried in Australia?
The Wiring Rules set a minimum depth of cover for each way of installing an underground cable, and for the usual method, heavy-duty conduit, that minimum is around 500 mm. Depth of cover is measured from the finished ground surface down to the top of the conduit, not to the bottom of the trench.
Orange marker tape is laid in the trench above the conduit, so anyone digging later hits the tape before the cable. Shallower installations are permitted only where the cable gets extra mechanical protection, such as a concrete slab laid over it or concrete encasement. The exact combinations of depth and protection are set out in a table in AS/NZS 3000, and a cable is installed to the edition in force when the work was done.
Driveways deserve extra care. A cable under a driveway has to cope with vehicle loads, so the protection over it matters as much as the depth.
Who owns the underground cable you might hit?
The street cables belong to the network, but every cable on your side of the point of supply belongs to you, and that changes who can tell you where it is. On an underground connection, the point of supply is usually the pillar or pit at the boundary. Our guide to submains vs consumer mains explains where that line falls.
| Cable | Where it runs | Who owns it | Will Before You Dig show it? |
|---|---|---|---|
| Street network cable | Under the footpath and road | Ausgrid or Endeavour Energy | Yes, from the network's plans |
| Consumer mains | Boundary pillar or pit to your meter box | The property owner | Usually not |
| Submains | Across the yard to a shed, granny flat or pool | The property owner | No |
| Garden and pool equipment cables | Through garden beds and lawn | The property owner | No |
Some properties on shared driveways and battle-axe blocks also have a privately owned pillar that feeds several homes. The cables leaving it belong to the owners, not the network, so they will not appear on network plans either.
Why might a cable be shallower than the rules say?
Because the ground over a cable keeps changing after the trench is backfilled. The common reasons we find a cable higher than expected:
- Landscaping. Regrading a yard, cutting in a terrace or lowering a lawn takes cover off the top without anyone touching the cable.
- Older work. Cables laid decades ago were installed to the rules of the day, and some were never installed to any rules at all.
- Sandstone. A lot of Sydney sits on rock. A trench that hit sandstone short of full depth should have had extra protection added, and not every installer added it.
- Unlicensed work. A cable run to a shed or garden lights by someone who was not an electrician may sit just under the turf, with no conduit and no tape.
The safe assumption is that every cable is live and shallower than you think until it has been located and exposed.
How do you find underground power cables before you dig?
Lodge a free Before You Dig Australia enquiry for the network side, and have the private cables on your property traced by a cable locator. The full process:
- Lodge a Before You Dig Australia enquiry. It is free, and the asset owners in the area, including the electricity network and telecommunications companies, send back plans of their cables and pipes.
- Look for clues on site. Conduit entering the bottom of the meter box, a pit near the boundary, cable rising up the wall of a shed or granny flat, garden lights and pool equipment all point to a cable route.
- Check your records. House plans, a site survey, or the electrician who did the original work may show the route.
- Get the private cables traced and marked. A locator traces live cables from the surface and marks their route, which covers the cables the network plans leave out.
- Hand dig near the marks. Located positions are approximate, so expose the cable carefully by hand or with vacuum excavation before any machine works close to it.
Planning to dig near a power cable?
DM Electrical runs, relocates and replaces underground cables across the Northern Beaches, North Shore and wider Sydney, with our own trenching. Based in Brookvale, Level 1 and Level 2 ASP accredited.
What should you do if you hit an underground power cable?
Stop work, keep everyone clear of the cable and anything touching it, and call for help straight away. Do not touch exposed conductors, the tool that struck them, or wet ground around the strike.
- Street cable. Call the network's emergency line: Ausgrid on 13 13 88 or Endeavour Energy on 131 003.
- Cable on your property. If you can reach the switchboard safely, turn off the main switch, then call an electrician. Our 24/7 emergency electrician service covers strikes after hours and on weekends.
- On a machine. Stay on it unless there is fire, and warn others to keep away.
Get the cable checked even when nothing seems to happen. A nicked outer sheath lets moisture in, and the damage can show up weeks later as a safety switch that trips in wet weather. If that sounds familiar, our guide on finding the cause of RCD tripping covers the next steps.
Who can install or move an underground power cable?
It depends which side of the point of supply the cable sits on. A licensed electrician can install a submain to a shed, granny flat or pool. Connecting underground consumer mains to the network at the pillar or pit is Level 2 ASP work in NSW, the boundary explained in our guide to Level 1 vs Level 2 electricians.
Some owners want to dig the trench themselves to save money. Agree it with your electrician first, because the depth, bedding, conduit and marker tape all have to meet the rules before the electrician can certify the work. DM Electrical handles the excavation in-house alongside the Level 2 connection work, and on bigger jobs, such as our Church Point undergrounding project, we coordinate the trenching and network relocation with Ausgrid.
Frequently asked questions
How deep is an underground power cable to a shed?
If it was installed in heavy-duty conduit to the Wiring Rules, expect about 500 mm of cover, or less where a concrete slab or encasement was added for protection. Older or unlicensed cables can be much shallower, so have the cable located before you dig.
Does Before You Dig show cables on my property?
Usually not. Before You Dig Australia passes your enquiry to asset owners such as Ausgrid, Endeavour Energy and telecommunications companies. Cables you own, such as consumer mains, submains and garden lighting, are not on their plans, so a cable locator is needed for those.
What colour is underground electrical conduit?
Orange. In Australia, orange conduit and orange marker tape identify electrical cables underground. If you uncover orange tape while digging, a cable is close below it, so stop using machinery and expose it by hand.
How deep are Ausgrid street cables?
It varies with the age of the network, the voltage and the street, and no depth is guaranteed. Network plans from Before You Dig Australia show the approximate location only, so hand dig to expose the cable before working near it.
The bottom line
Expect around 500 mm of cover for a cable in heavy-duty conduit, but never rely on it. Lodge a Before You Dig enquiry, get the private cables on your property traced, and hand dig near the marks. If you are planning a new underground supply or need a cable moved, get in touch and we will plan the route and the trench with you.